Possible Testing Space
Today I went to check out a possible space on Drexel’s campus for testing the engineer’s motion capture system. The Annex building, located on Cherry Street (between 32nd and 33rd streets), had a room that was just about the width of the stage in Mandell Theater; however, the room wasn’t very deep so I don’t think we will be able to use the space after all. Click here to see the photos and measurements I took.
February 14th, 2007